Targeted Consultation
Thank you to everyone who took part in our targeted consultation which ran from Tuesday 8 October 2024 to Friday 8 November 2024.
This consultation is now closed.
Following the close of this targeted consultation, we are now reviewing any additional feedback we receive before we submit our Development Consent Order (DCO) application, planned for end of 2024.
Consultation materials produced for the targeted and statutory consultations are still available in the documentation library.
Proposed amendments to the draft Order Limits
As part of the targeted consultation, we proposed revisions to the “Order Limits” – the defined boundary within which land will be used, or rights to the land acquired, to deliver the Proposed Development. This includes areas needed temporarily during construction, operation, or maintenance.
We presented draft Order Limits at our statutory consultation earlier this year. The feedback received at this consultation and further surveys and assessments identified some changes to the draft Order Limits.
There are 19 identified proposed changes to the draft Order Limits, where additional land is required to enable the construction and operation of Peartree Hill Solar Farm. These amendments are located within Land Areas B to F and along the cable corridor. To view detailed plans for each of these changes, click the links in the table below. You can also view our targeted consultation brochure.
The changes proposed as part of this targeted consultation are minor and have been assessed as not introducing any new significant environmental effects. Therefore, the changes do not alter the conclusions of the PEIR presented at statutory consultation.
Contact us
To contact the project team you can:
info@peartreehillsolar.co.uk
01482 695 004
Freepost PEARTREE HILL SOLAR FARM
or follow us on Facebook for regular updates