Thank you to everyone who took part in our statutory consultation from 15 May to 26 June 2024. Our statutory consultation materials are still available in the documentation library.
Feedback from the statutory consultation and further design and assessment work has identified 19 revisions to the draft Order Limits which require additional land for the construction and/or operation of the Proposed Development. We are now seeking your views of these changes. More information is below or in our targeted consultation brochure.
This targeted consultation will run from Tuesday 8 October 2024 to Friday 8 November 2024.
About the consultation
This targeted consultation gives you the opportunity to comment on the revisions to the draft Order Limits. We will use this feedback to finalise our proposals before we submit our application for a Development Consent Order.
Responses to this targeted consultation should be sent to the following:
- Emailing us at info@peartreehillsolar.co.uk
- Writing to us at Freepost PEARTREE HILL SOLAR FARM (no stamp required)
Please provide any feedback you have by 11:59pm on Friday 8 November 2024.
Proposed amendments to the draft Order Limits
We are proposing revisions to the “Order Limits” – the defined boundary within which land will be used, or rights to the land acquired, to deliver the Proposed Development. This includes areas needed temporarily during construction, operation, or maintenance.
We presented draft Order Limits at our statutory consultation earlier this year. The feedback received at this consultation and further surveys and assessments have identified some changes to the draft Order Limits.
There are 19 identified proposed changes to the draft Order Limits, where additional land is required to enable the construction and operation of Peartree Hill Solar Farm. These amendments are located within Land Areas B to F and along the cable corridor. To view detailed plans for each of these changes, click the links in the table below. You can also view our targeted consultation brochure.
The changes proposed as part of this targeted consultation are minor and have been assessed as not introducing any new significant environmental effects. Therefore, the changes do not alter the conclusions of the PEIR presented at statutory consultation.
Contact us